Lorem ipsum dolor sit amet, pri et feugiat consulatu. Eu per ceteros platonem. Ea dictas legendos ius. At adhuc solum has. Nec at harum euripidis, habeo elitr patrioque ne mel. Mei probo oportere posidonium in, has ei everti volutpat consequat.
Profender Factory Design & Construction Phase 1
60.00m x 80.00m x 10.00m
Area 4,800m2
Profender Factory Design & Construction Phase 2
50.00m x 80.00m x 10.00m
Area 4,000m2
Shelter
25.50m x 63.600m x 10.20m
Area 1,621.80m2
SCGPE WASTE TO ENERGY POWER PLANT 8.4 MW
Chonburi Clean Energy Power Plant (CCE) 6.9 MW Industrial Waste to Energy
MG Chaiyaphoom
Showroom & Service Center
Area 1,800 m2 sq.m.
Lorem ipsum dolor sit amet, pri et feugiat consulatu. Eu per ceteros platonem. Ea dictas legendos ius. At adhuc solum has. Nec at harum euripidis, habeo elitr patrioque ne mel. Mei probo oportere posidonium in, has ei everti volutpat consequat.
Factory Billion Terminal
66.00m x 90.00m x 9.00m Area 5,900m2
Warehouse Billion Terminal
78.00m x 128.00m x 9.00m Area 9,984m2
NTPC Warehouse 48.00m x 36.00m x 12.00H Area 1,728m2
เว็บไซต์นี้มีการใช้งานคุกกี้ เพื่อเพิ่มประสิทธิภาพและประสบการณ์ที่ดีในการใช้งานเว็บไซต์ของท่าน ท่านสามารถอ่านรายละเอียดเพิ่มเติมได้ที่ Privacy Policy
and Cookies Policy